[Geomag-daily] Daily Report, 11-1-2021 (305)
Worthington, Bill
bworth at usgs.gov
Mon Nov 1 16:56:46 UTC 2021
The following issues were noted earlier today:
BOU E-Field(2021-11-01): OK
BRW(2021-11-01): BRT has been offline since 18:11, 10/28.
DED(2021-10-31): There is a Z and Delta F spike at 17:52.
DED(2021-11-01): The outdoor temperature probe is not working properly.
CMO(2021-11-01): There is a spike in H at 02:26 producing a Delta F spike.
FRN(2021-11-01): Outdoor temperature probe is not working properly.
GUA(2021-10-31): Construction disturbance 22:00 to 23:59.
GUA(2021-11-01): Construction Disturbance 0:00 to 05:20.
SIT(2021-11-01): No data, but repairs are underway.
SHU(2021-11-01): The outdoor temperature probe is not working properly.
SJG(2021-11-01): F and Delta F spikes at 04:23 and 04:31.
Dst(2021-11-01): Dst-3 has the Guam construction disturbances present.
Bill
----------------------------------------------------------------
Bill Worthington
Geophysicist Tel: 303-273-8472
U. S. Geological Survey Fax: 303-273-8506
Geomagnetism Program Cell: 303-895-6150
PO Box 25046, MS 966
Denver, CO 80225 bworth at usgs.gov
----------------------------------------------------------------
-------------- next part --------------
An HTML attachment was scrubbed...
URL: <http://geohazards.usgs.gov/pipermail/geomag-daily/attachments/20211101/809939df/attachment.html>
More information about the Geomag-daily
mailing list