[EHPweb] Fw: Campus Power Outage
Christopher J Bidwell
cbidwell at usgs.gov
Mon Jul 12 16:47:09 UTC 2010
We may want to think about failing over to ehpbackup during this time.
This power outage will last up to 12 hours and affect all of our servers
in Menlo Park except I believe ehp3.
----------------
Thank you,
Chris Bidwell, RHCT
Red Hat Linux Administrator
Geologic Hazards Team
US Geological Survey
email: cbidwell at usgs.gov
work: 303-273-8642
mobile: 303-435-6362
----- Forwarded by Christopher J Bidwell/GD/USGS/DOI on 07/12/2010 10:46
AM -----
From:
Stan Silverman <silver at usgs.gov>
To:
Christopher J Bidwell <cbidwell at usgs.gov>
Date:
07/12/2010 10:45 AM
Subject:
Fwd: Campus Power Outage
chris
here's the power outage email -- i believe that the ups will not operate
-- certainly not for 12 hours
i'll let you know about changes to the schedule
stan
Begin forwarded message:
From: jeremy.bargmann at gsa.gov
Date: July 9, 2010 12:34:09 PM PDT
To: GS-CAmnl.Bldg.15 at usgs.gov, GS-CAmnl.All at usgs.gov,
williama.mcdonald at gsa.gov
Cc: sandyl.sitton at gsa.gov, cielito.legaspi at gsa.gov,
suzanne.paulette at gsa.gov, shelley.pardini at gsa.gov, rick.uria at gsa.gov
Subject: Campus Power Outage
Good Afternoon Everyone,
According to safety regulation all main, and branch circuit breakers,
transformers, and power panels must to be tested every three years.
Currently they are due in all buildings at the USGS campus. Testing of
these systems require that there be absolutely no power to the building,
including generator power (for those buildings so equipped). To accomplish
this, power from P.G. & E. will be taken of line to the buildings during
the testing.
All persons are required to leave the building before the scheduled
testing, and may not return until testing has been completed. This is due
to all building power being shut down for the testing. Also please power
down and secure all sensitive electronic equipment not on UPS prior to the
scheduled testing time.
Testing for the campus has been scheduled for July 24 & 25 of this month,
with testing to begin at 6:00 AM through 6:00 PM on each day. Buildings 4,
3a, 16, 9g, 11, 10, will be tested on Saturday the 24th, and buildings 20,
1c, 15, 1&2, 3, 9e on the 25th.
We greatly appreciate your patience and cooperation in this matter, and we
will do our best to minimize any inconvenience.
Jeremy Bargmann
Assistant Property Manager
345 Middlefield Rd
Building 20
Menlo Park, CA 94025
(Office) 650-329-4686
(Cell) 650-815-6579
(Fax) 650-329-4244
(e-mail) Jeremy.Bargmann at gsa.gov
-------------- next part --------------
An HTML attachment was scrubbed...
URL: <http://geohazards.usgs.gov/pipermail/ehpweb/attachments/20100712/fd85b5b0/attachment.html>
More information about the EHPweb
mailing list