<div dir="ltr"><div><br></div><div>FYI</div><br><br><div class="gmail_quote"><div dir="ltr">---------- Forwarded message ---------<br>From: <strong class="gmail_sendername" dir="auto">Table Mountain</strong> <span dir="ltr"><<a href="mailto:tmmodernization@gmail.com">tmmodernization@gmail.com</a>></span><br>Date: Thu, Sep 20, 2018 at 9:01 AM<br>Subject: [EXTERNAL] Re: [tblmnt] Table Mountain Power Outage - 9/19/2018<br>To:  <<a href="mailto:tblmnt@googlegroups.com">tblmnt@googlegroups.com</a>><br></div><br><br><div dir="auto">Evidently the electrical switch over had a glitch. Buildings I10C and T2 are still without power this morning. I've reported this to Poudre Valley REA, and also managed to track down the linemen still in the area. I'm hoping they just forgot to throw a switch.<div dir="auto"><br></div><div dir="auto">Since this affects I10C, the Table Mountain network won't be operational until the power is restored.</div><div dir="auto"><br></div><div dir="auto">- Wayde</div></div><br><div class="gmail_quote"><div dir="ltr">On Wed, Sep 12, 2018, 9:11 AM Allen, Wayde <<a href="mailto:jallen@ntia.doc.gov" target="_blank">jallen@ntia.doc.gov</a>> wrote:<br></div><blockquote class="gmail_quote" style="margin:0 0 0 .8ex;border-left:1px #ccc solid;padding-left:1ex">




<div dir="ltr">
<div id="m_6841326510513501088m_2775113448514130394divtagdefaultwrapper" style="font-size:12pt;color:#000000;font-family:Calibri,Helvetica,sans-serif" dir="ltr">
<p style="margin-top:0;margin-bottom:0">I've been contacted by Poudre Valley REA, about a scheduled power outage at the Table Mountain.</p>
<p style="margin-top:0;margin-bottom:0"><br>
</p>
<p style="margin-top:0;margin-bottom:0">When: September 19, 2018 (next Wednesday)<br>
</p>
<p style="margin-top:0;margin-bottom:0"><br>
</p>
<p style="margin-top:0;margin-bottom:0">Beginning: 10:00 am<br>
</p>
<p style="margin-top:0;margin-bottom:0">Ending:         4:00 pm</p>
<p style="margin-top:0;margin-bottom:0"><br>
</p>
<p style="margin-top:0;margin-bottom:0">They have been updating power poles, pulling new power line, and changing transformers for a voltage change on the main distribution grid. I am told that this should complete this work.<br>
</p>
<p style="margin-top:0;margin-bottom:0"><br>
</p>
<p style="margin-top:0;margin-bottom:0"><br>
</p>
<div id="m_6841326510513501088m_2775113448514130394Signature">
<div id="m_6841326510513501088m_2775113448514130394divtagdefaultwrapper" style="font-size:12pt;color:rgb(0,0,0);font-family:Calibri,Arial,Helvetica,sans-serif,"EmojiFont","Apple Color Emoji","Segoe UI Emoji",NotoColorEmoji,"Segoe UI Symbol","Android Emoji",EmojiSymbols">
<p>- Wayde</p></div></div></div></div></blockquote></div></div></div>