<div dir="ltr">The following issues were noted this morning:<br><br><br><font color="#0000ff"><b>Boulder E-Field</b> -  Down.  This will be checked Wednesday<br><br><b>College</b> - There was a F and Delta F spike at 19:27.<br><br><b>Deadhorse Test</b> -  Still Down</font><br><br><font color="#ff0000"><b>Stennis</b> - No data from either system since January 2.  There was a power outage there.   Andrea is going to look into this.  </font><br><br><font color="#ff0000"><b>Shumagin</b> - No GOES transmissions and cannot connect to the Display computer.</font><br><br><font color="#0000ff"><b>Dist</b> - None<br><br><b>SQ</b> - None<br><br><b>SV</b> - None<br><br><b>Dst</b> - None</font><br><br>Bill<br><br>-----------------------------------------------------------------------<br>Bill Worthington, Ph.D.<br>U. S. Geological Survey        Tel: 303-273-8472<br>Geomagnetism Program       Fax: 303-273-8506<br>P.O. Box 25046  MS 966      Cell: 303-895-6150<br>Denver, CO  80225               <a href="mailto:bworth@usgs.gov">bworth@usgs.gov</a><br>-----------------------------------------------------------------------</div>