[Geomag-daily] Daily Report, 9-6-2022 (249)
Worthington, Bill
bworth at usgs.gov
Tue Sep 6 17:42:01 UTC 2022
The following issues were noted earlier today:
BOU E-Field(2022-09-06): OK.
CMO(2022-09-05): There is a F and Delta F spike at 21:31.
DED(2022-09-06): Still off-line. Have the new ethernet switches be shipped yet?
GUA(2022-09-06): There are still occasional Delta F disturbances, just about every day.
HON(2022-09-06): Both systems are still down, while power is being restored to the site.
SIT(2022-09-05): Data flow stopped at 17:57 on the 5th. It sounds like it is a network problem.
SIT(2022-09-06): Off-line due to network issues.
SJG(2022-09-05): There are F spikes at 18:26 and 20:24
TUC(2022-09-06): There is a F and Delta F spike at 13:11.
Dst(2022-09-06): Both Dst traces are blank due to Honolulu being down.
Bill
----------------------------------------------------------------
Bill Worthington
Geophysicist Tel: 303-273-8472
U. S. Geological Survey Fax: 303-273-8506
Geomagnetism Program Cell: 303-895-6150
PO Box 25046, MS 966
Denver, CO 80225 bworth at usgs.gov
----------------------------------------------------------------
-------------- next part --------------
An HTML attachment was scrubbed...
URL: <http://geohazards.usgs.gov/pipermail/geomag-daily/attachments/20220906/e797e890/attachment.html>
More information about the Geomag-daily
mailing list