[Geomag-daily] Daily Report 2021-08-17(229)

Geels, Brendan R bgeels at usgs.gov
Tue Aug 17 15:00:42 UTC 2021


The following issues were noted earlier today:

DED(2021-08-17): Outside temperature probe needs repair or replacement.

FRD(2021-08-16): Small disturbances in ΔF 1827-2359.
FRD(2021-08-17): Small disturbances in ΔF 0000-0257.

FRN(2021-08-17): Outside temperature probe needs repair or replacement.

TUC(2021-08-16): Several small gaps in HEZ and temperatures from 1516 to 1549. Spikes in F throughout the day.
TUC(2021-08-17): Gaps in HEZ and temperatures at 1411-1415 and 1417-1429. Occasional fin-shaped offsets in Z and temperature channels 0855-now. A new power board will be sent out and installed here soon.

BSL(2021-08-17): Small disturbances in HEZF 1119-1125.

SJG(2021-08-17): Disturbances and offsets in HEZF are expected today from VAT removal/tile installation project.

GUA(2021-08-16): Several spikes in HEZF occurred between 1610 and 1715. Small spikes in F at 1958 and 2047.

Dist(2021-08-16): Gaps in TUC as noted above. Gap in BSL 2039-2135.
Dist(2021-08-17): Gaps in BSL at 0120-0255, 0339-0445 and 1123-1305. Gap in TUC as noted above. Disturbances in SJG as noted above.
Dst(2021-08-17): Disturbances in SJG and USGS from tiling work.
-------------- next part --------------
An HTML attachment was scrubbed...
URL: <http://geohazards.usgs.gov/pipermail/geomag-daily/attachments/20210817/7d98734b/attachment.html>


More information about the Geomag-daily mailing list