[Geomag-daily] Daily Report, Tuesday, March 20, 2018, YD 079

Sauter, Edward esauter at usgs.gov
Tue Mar 20 14:48:16 UTC 2018


 All,
The following discrepancies were noted this day:

*Barrow Test.  BRT was restored at 2343 UT, on 3/19/18 (YD 078). *

*Deadhorse.  Starting at 1727  UT, on 3/19/18 (YD 078), all the inside
temperatures raised about 3.5 degrees Centigrade.  Did someone adjust the
thermostat inside the Combo Building?   There was one bad Total Field value
recorded during minute 1728 UT, on 3/19/18 (YD 078).   *

*College.  **There was one bad Total Field value recorded during minute
1647 UT, on 3/19/18 (YD 078).*

*Fresno.  At 1624 UT, on 3/19/18 (YD 078) there was an adjustment to the H
component calibration factors, causing ~0.4 nT offset in the Del F plot.
>From 1909 through 1920 UT, on 3/19/18 (YD 078), there were offsets in the
Dist, SQ and SV plots.*

*Dist, SQ and SV.  In addition to the offsets noted above at Fresno, there
were also offsets to the SV plots at Newport, Tucson and Stennis from 1909
through 1920 UT, on 3/19/18 (YD 078) *


*Boulder E-Field.  None*

*DST.  There is the daily offset in the USGS Dst-1min plot resulting from
the corresponding data gap in the plot for Kakioka at around the end/start
of each day.*

That's all.
Ed Sauter


-- 
Edward A. Sauter`
US Geological Survey
Box 25046 DFC, MS 966
Denver, CO 80226-0046 USA
E-mail: esauter at usgs.gov
Phone: 303-273-8471
Fax 303-273-8506
-------------- next part --------------
An HTML attachment was scrubbed...
URL: <http://geohazards.usgs.gov/pipermail/geomag-daily/attachments/20180320/34fb55cd/attachment.html>


More information about the Geomag-daily mailing list