<br><font size=2 face="sans-serif">All,</font>
<br>
<br><font size=2 face="sans-serif">There is a scheduled power outage tomorrow,
Jan 31 2009, from 0700-1500 here in Golden. All non-essential systems
must be powered down. </font>
<br>
<br><font size=2 face="sans-serif">I will keep ehpbackup, ehp1, and ens3-5
online since it's got the system monitoring running and they are mission
critical systems.. I will be powering down ehpdevel and ehpstage
by COB today.</font>
<br><font size=2 face="sans-serif">If anyone has any objections to this,
please let me know.</font>
<br>
<br><font size=2 face="sans-serif">Actually, Stan, would we be able to
power down any of the ens machines?</font>
<br><font size=2 face="sans-serif">----------------<br>
Thanks,<br>
<br>
Chris Bidwell, RHCT<br>
Red Hat Linux Administrator<br>
Geologic Hazards Team<br>
US Geological Survey<br>
email: cbidwell@usgs.gov<br>
work: 303-273-8642<br>
mobile: 303-435-6362<br>
</font>